Property Snagging & Inspections in Dubai

After the repairs

Reinspection in Dubai

When you are told the snags have been fixed, a Reinspection (sometimes called de-snagging) checks each earlier finding again and records what now appears resolved, what remains open and what could not be checked.

Illustration: a home with a ticked circle and a circular arrow, showing a repeat check of items reported as addressedIllustrative image

Coordinated by SnagRight. The visit is performed, and the update signed, by an appropriately licensed inspection provider, subject to verification and confirmed in your agreement.

On this page

What is a reinspection?

A reinspection is a return visit to check findings from an earlier report. It is not a fresh, full inspection. Its purpose is narrow and practical: to tell you, item by item, whether each earlier finding now appears rectified in the accessible areas.

Who is it for?

  • buyers who submitted a snagging report at handover and have been told the work is complete;
  • owners who raised items during a Defects Liability Period (DLP) and want to confirm the response before the period ends;
  • resale buyers whose seller agreed to carry out specific repairs before transfer;
  • owners whose renovation or fit-out contractor reports that items from a post-renovation inspection have been put right;
  • owners abroad who need an independent update without travelling to check the work themselves.

When should a reinspection be booked?

Book it after the developer, seller or contractor tells you the repairs are finished, ideally in writing. Before booking:

  • ask for a list of the items they say were addressed, using your original reference numbers if possible;
  • check that the property is clean and accessible, with no trades still working;
  • make sure water, electricity and cooling are on, so repaired fittings can be checked in use.

Booking too early can mean paying for a visit that records most items as still in progress.

How are reinspection terms set?

Whether a reinspection is included in your original quote, how many items it covers and when it can take place are set out in writing before the visit. A reinspection is never assumed to be included unless your quote says so.

Reinspection terms

Terms are confirmed in writing in your quote.

How is a reinspection different from the first inspection?

The first inspection asks an open question: what can be observed in the agreed areas of this property? A reinspection asks a closed one: has each listed item been dealt with? That makes it shorter and more focused, and it means the quality of the original report matters. Clear reference numbers, locations and photographs make each item easy to find and compare. Vague entries such as "paint touch-ups needed throughout" are harder to verify, because it is unclear what was originally meant.

What is checked?

The scope is the list of earlier findings, confirmed in your quote. For each item, the inspection provider:

  • locates it using the original reference number, room and photograph;
  • observes its current condition and, where safe, operates the fitting or opening;
  • photographs it from a comparable position where practical;
  • records one of three statuses: appears resolved, remains open, or could not be checked.

If the developer's repair has visibly disturbed nearby finishes, for example by damaging paint while replacing a fitting, that can be noted against the same item.

What is outside the scope?

  • items that were not in the earlier report, unless you add them to the scope;
  • a complete fresh inspection of the property;
  • confirming the quality of concealed work, such as pipework behind a refitted panel;
  • judging whether the developer was obliged to repair a particular item.

What access and utilities are needed?

  • access to every room containing an item on the list;
  • water, electricity and cooling running;
  • the earlier report, and any list of completed works from the responsible party.

What does the update contain?

You receive a status update rather than a new full report. It is set out as a table that follows your original reference numbers, showing for each item:

  • the original description and location;
  • the status on this visit;
  • a current photograph where practical;
  • a short note, such as "seal replaced; door closes evenly" or "staining still visible".

A summary at the top lists how many items fall under each status, so open items are easy to see. The sample report includes an illustrative reinspection table.

What happens after a reinspection?

Send the update to the responsible party through the same formal channel you used before, asking them to address the items that remain open. Keep each version of the report and each response, so the history is complete. Our developer rectification guide shows how to keep a simple log.

If several items remain open, a further visit can be arranged once you are told they are complete. Each further visit is quoted, and its terms confirmed, in writing.

Educational diagram of the path from finding to follow-up: observe, document, review, submit, correct and recheck

From finding to follow-up

  1. What you may see The path an item can take: observe it, document it with a photo and location, review it, submit it to the responsible party, see it corrected, and recheck if agreed.
  2. Why it may matter Seeing the whole path helps set expectations: documenting a snag is the start, and whether it is corrected depends on the developer or contractor.
  3. What this does not establish Correction is carried out by a third party and is not within SnagRight’s control. A recheck is optional and arranged by agreement, not automatic.
  4. A sensible next step Submit the documented items to the responsible party and, where you want confirmation, arrange a recheck of the agreed points.

Illustrative guidance — technical review pending. Correction is third-party dependent and any recheck is optional, by agreement.

Common questions

Is a reinspection included with my original inspection?

It depends on what you agreed. Some quotes include a reinspection on stated terms; otherwise it is quoted separately. The terms are always confirmed in writing before the visit.

My first report came from another company. Can you still help?

Possibly. Share the report when you enquire. Whether it can be used as the basis for a reinspection, and how, is confirmed in the quote.

Will new issues be recorded if they are noticed?

A reinspection focuses on the earlier findings. If something new and obvious is seen, the provider may note it, but a full fresh inspection is a separate scope.

What if the developer has only fixed some items?

That is exactly what the status update is for. It lists each item as appearing resolved, remaining open or not checked, so you can follow up on what is left.

Does 'appears resolved' mean the repair will last?

No. It means the item appeared rectified on visual inspection on that day. It does not confirm the quality of concealed work or future performance.